Microsoft 365 migration checklist

The steps that separate a smooth Microsoft 365 migration from a disruptive one — whether you are moving from Google Workspace, another tenant, hosted email or file servers.

Clements & Cox South Africa · Published

What are the steps to migrate to Microsoft 365?

Discover what you have; prepare the tenant with identity, licences and a security baseline; design the new structure for mail, Teams, SharePoint and OneDrive; pre-stage mail and files; communicate with users; cut over by switching MX records and sign-in in a planned window; run a final sync; support users through hypercare; then decommission the old platform.

Before the migration

  • Inventory users and mailboxes, including shared mailboxes, aliases, distribution lists and resource calendars.
  • Measure data volumes for mail and files — they drive timelines.
  • Map dependencies: devices, printers and scanners that send email, applications that use SMTP, line-of-business systems with mail integration.
  • Check DNS access for your domains — you will need it for verification and MX changes.
  • Choose licences that match what people need, including security features.

Prepare the tenant

  • Verify domains and set up identities (and directory synchronisation if needed).
  • Apply a security baseline from day one: multi-factor authentication, admin protection, sharing policies — see Microsoft 365 security.
  • Design the SharePoint and Teams structure rather than copying old file shares as they are.
  • Agree permissions for each site and team.

Migrate

  • Pre-stage historical mail and files before cutover to minimise downtime.
  • Pilot with a small group to test the process and support material.
  • Communicate what changes, when, and what users need to do.
  • Cut over in a planned window: switch MX records, update autodiscover, move sign-in.
  • Final sync to catch items that arrived during the switch.

After the migration

  • Hypercare: extra support for the first days while people adjust.
  • Reconfigure devices and applications that sent mail through the old system.
  • Validate that SPF, DKIM and DMARC are correct for the new platform.
  • Decommission the old platform only once data is confirmed and retention needs are met.
  • Hand over to ongoing administration — see Microsoft 365 management.

Connected capabilities

Where this connects to the rest of the work

Technology does not operate in silos. These are the capabilities that most often sit alongside this one in a real engagement.

Ready when you are

Plan your Microsoft 365 migration

We will run discovery and give you a realistic plan and timeline.